How long to build a website?

How long it takes to build a website depends less on coding than on content and decisions. Realistic timelines, stage by stage, and how to avoid the usual delays.

Laptop with a timeline, phone and paper calendar with notes on a desk, a month-by-month digital marketing strategy

With me, a landing page takes from 10 days and a business website, even a large one, up to about 30 days from the signed agreement to launch. A typical five to ten page small business site sits somewhere in between. Those numbers assume one thing: that content, access and feedback arrive on time. In my experience, that is what decides how long it takes to build a website far more than the design or the code.

This article breaks the timeline into stages, shows where the days actually go, and lists the delays I see most often, so you can plan a launch date you can trust.

Typical timelines by type of website

Type of website Typical timeline with me What drives the time
Landing page from 10 days Copy and one round of feedback
Small business website (5 to 10 pages) about 2 to 4 weeks Copy for each service page, photos
Large website on a custom CMS up to 30 days Number of page types, features, content volume
Online store quoted with the project Product data, payments, shipping setup

Agencies often quote longer, partly because work passes between several people. Working alone means fewer handovers, but it also means I plan your project into my calendar, so a quick start helps everyone.

Notice what the right-hand column says. None of the main drivers is "coding". Building pages is the most predictable part of the job. The unpredictable parts are words, photos and decisions, which is why the same five-page site can take two weeks for one owner and two months for another. A landing page for a tradie in Mackay with one service and clear prices moves fast; a site for a clinic with twelve practitioners, each needing a bio, moves at the speed of twelve people's approvals.

The stages, one by one

Before the clock starts: the call and the plan

Every project begins with a free 30-minute call. We talk about your business, your customers and what the website must achieve. Then I prepare a plan with the page list, features, price and timeline. You can take as long as you like to decide; the build timeline starts when the agreement is signed and the first payment is made.

Stage 1: brief and access (days 1 to 3)

I need a completed brief, access to your domain and any existing site or analytics, your logo, and the photos you have. If you are not sure what to put in a brief, there is a website brief template you can copy. The faster this arrives, the faster everything else moves.

Stage 2: structure and copy (roughly the first third)

I map out the pages and write the copy. For a small business site this is the longest stage, because every service page needs its own text and you need to check that what I wrote is accurate. Prices, service areas, licence details and the way you describe your work all come from you.

Stage 3: design (roughly the middle third)

Once the copy is approved, I design the page templates around it, mobile first. You see the design and can request changes; three rounds of revisions are included across the project.

Stage 4: build, content and testing (the final third)

I build the site, add the content, set up forms, the edit panel, basic SEO and redirects from your old site if there is one. Then I test on phones and browsers, and check that every form actually delivers to you.

Stage 5: launch and training

The site goes live on your domain. I show you how to update text, prices and photos yourself, and support is included after launch. The final payment is due when you have the working site.

What actually causes delays

Almost every late website I have heard of was late for one of these reasons, and none of them are about coding:

  1. Copy approvals sit in an inbox. A week waiting for "I'll look at it on the weekend" is a week added to the launch.
  2. Photos do not exist yet. If you want photos of your team, vehicles or finished jobs, book the shoot before the project starts.
  3. Domain access is lost. Nobody remembers which registrar the domain is with, or the login belongs to a former employee or an old designer.
  4. Too many decision makers. Three business partners with three opinions on the homepage can triple the revision time.
  5. The scope grows mid-project. "Could we also add online booking?" is a fair question, but it adds days.
  6. Holidays. Christmas and the January shutdown slow down everyone, including your own replies. School holidays and EOFY in June can do the same.

How to get your website built faster

You cannot rush good copy, but you can remove waiting time:

  • Prepare a one-page brief before the first call: services, areas, prices, competitors you admire.
  • Find your domain login and check who it is registered to. A .com.au name should be in your business's name.
  • Collect photos early, even phone photos of your work, so design is not held up.
  • Pick one person who approves the website and has the final say.
  • Block time for feedback. Thirty minutes on the day a draft arrives beats an hour a week later.

Working across time zones

I work remotely and Europe is a long way from Australia in hours. In practice this helps more than it hurts: you send feedback at the end of your day, and changes are often done by the time you wake up. Calls are booked in your morning or evening, whatever your time zone (AEST, ACST or AWST), and I reply to messages within one business day.

Deadlines you can hold me to

The deadline goes into a written agreement. If missing it would cost you money, for example because a campaign or a season depends on the launch, late-delivery penalties can be written into the contract. Payment is split 30/40/30 across the project, so you never pay far ahead of the work.

If you have a date in mind, such as the start of summer for a pool business or EOFY for an accountant, tell me on the first call and I will plan the project backwards from it. Details of how I build are on the web design page, and you can start with the website brief form.

Free · 30 minutes

Let’s talk
about your business

Before the call I review your website and ads. After the call you get an action plan and a price range in writing.

Tom Goldman, one-person marketing agency working remotely with Australian businesses, portrait
Author
Tom Goldman

12+ years in online marketing, 100+ clients. I build websites, Google Ads and Meta ads campaigns, CRMs and automations for small and mid-sized businesses. About me →

FAQ

Website timeline
questions

Can you build a website in a week?

A focused landing page can be close to that if your brief, offer and approvals are ready, but my standard timeline starts from 10 days. A multi-page business website needs more time, mainly for writing and checking the copy for each service. Rushing that part usually costs enquiries later.

When does the timeline actually start?

When the agreement is signed, the first 30% payment is made and I have your brief and access. The planning call and the quote come before that and do not count. If something I need is missing, I let you know straight away so the clock is not wasted.

What happens if you miss the deadline?

The deadline is written into our agreement, and you can ask for late-delivery penalties to be included. If a delay is caused by something on my side, it is my problem to solve. If it is caused by missing content or feedback, I will tell you early so we can adjust together.

Can my website launch before a busy season?

Yes, if we start early enough. Tell me the date on our first call and I plan backwards from it. For seasonal businesses, such as air conditioning before summer or tax services before EOFY, I suggest starting six to eight weeks ahead to leave room for testing and ads setup.

Plan your launch date
with me

Tell me when you want the site live and what it needs to do. I will send back a realistic timeline and price, written down before any work starts.